King's Highway 401 - Images


Page 1 - Windsor to Highway 77    Page 2 ->

Essex Construction Images


Photos shown in this table are arranged from West to East:

Proper Municipality Name Photo Description Photo

Pictures taken from driver's perspective appear offset from centre-line pictures:        

East-
bound
West-
bound
Highway 401 ends at Highway 3, about 11 km east of the Ambassador Bridge in Windsor.  Click here for Highway 3 Images
Windsor - Tecumseh Boundary

County of Essex

Highway 3/401 looking west from the westbound Highway 3 overpass in Windsor.  This picture shows the western terminus of Highway 401 at Highway 3Highway 3 is divided with an urban cross section from Highway 401 westerly to the Ambassador Bridge.
Picture taken: December 5th, 2004.  Size: 70kb.
Windsor - Tecumseh Boundary

County of Essex

This picture shows the same scene as above with a wide angle lens.  This picture shows in greater detail the sharp curve at the western end of Highway 401 at Highway 3.  This curve has a posted advisory speed of 70km/h both directions.  Surely, this interchange would be rebuilt with better geometrics should the 401 be extended to any new Detroit River Crossing.
Picture taken: December 5th, 2004.  Size: 55kb.
Windsor - Tecumseh Boundary

County of Essex

Sign denoting the impending western terminus of Highway 401 at Highway 3 one km ahead.  At Highway 3, Highway 401 simply defaults into westbound Highway 3.  The Ambassador Bridge is located at Highway 3's western terminus, which is located roughly 11km northwest of Highway 401.
Picture size: 55kb.
Windsor - Tecumseh Boundary

County of Essex

Highway 401 looking west from the North Talbot Road overpass in Windsor.  North Talbot Road is located at roughly kilometre marker 12.  Notice the speed reduction that begins just west of North Talbot Road.  This speed is reduced from this point on to the western terminus of Highway 401, located about a kilometre ahead.
Picture taken: December 5th, 2004.  Size: 40kb.
Windsor - Tecumseh Boundary

County of Essex

Highway 401 looking east from the North Talbot Road overpass in Windsor.  This picture shows the interchange where Highway 3B (401A) meets the mainline Highway 401 lanes.  Highway 3B serves the Detroit-Windsor tunnel, and was downloaded in its entirety in 1998.  Notably, this is the first interchange on Highway 401 from Windsor.

Picture taken: December 5th, 2004.  Size: 45kb.

Highway 3B is the now defunct highway that led traffic from Highway 401 into Downtown Windsor, and the Detroit-Windsor Tunnel.  Click here for Highway 3B images.
Windsor - Tecumseh Boundary

County of Essex

Highway 401 driving west through the Highway 3B (now Dougall Avenue) interchange.  Highway 3B (Dougall Avenue) is a freeway for a short distance west of Highway 401 to Howard Avenue.  This short freeway is often referred to internally by the MTO as Highway 401A.
Picture taken: September 10th, 2005.  Size: 40kb.
Windsor - Tecumseh Boundary

County of Essex

Diagrammical overhead for the upcoming Highway 401/3B interchange.  This is the last interchange on Highway 401, and both options are access routes to border crossings.  The Detroit-Windsor tunnel (and Downtown Windsor) are accessible via Highway 3B (Dougall Avenue).  The 401 leads traffic to the Ambassador Bridge via Highway 3.
Picture taken: September 10th, 2005.  Size: 35kb
Windsor - Tecumseh Boundary

County of Essex

Highway 401 looking west from the 8th Concession Road overpass.  This overpass is located roughly at kilometre marker 15.  West of this overpass, Highway 401 encounters two closely spaced interchanges, and has a very narrow central median.  The two carriageways are separated with steel w-style guardrail.
Picture taken: September 10th, 2005.  Size: 45kb.
Windsor - Tecumseh Boundary

County of Essex

Looking east from the 8th Concession Road overpass.  East of this overpass, Highway 401 now proceeds through a much more rural environment, virtually all the way to easterly to London.

Picture taken: September 10th, 2005.  Size: 45kb.

Town of Tecumseh

County of Essex

Looking west from the 11th Concession Road overpass.  Highway 401 remains largely unaltered from its original configuration west of this interchange.    11th Concession Road is located at roughly kilometre marker 19.
Picture taken: March 17th, 2006.  Size: 50kb.
Highway 401 is being extensively upgraded and widened through Essex County Click here for more information and photos.
Town of Tecumseh

County of Essex

Looking east from the 11th Concession Road overpass.  As evident in the photo, the six laning contract western limits are located at the pictured Puce River bridge. 

Picture taken: March 17th, 2006.  Size: 40kb.
Tecumseh - Lakeshore Boundary

County of Essex

Looking west towards Windsor from the Manning Road overpass.  Notice that only two of the eastbound lanes are presently opened, despite the completed construction.  The inner lane will remain closed until the second phase of this contract is completed to east of Puce Road.
Picture taken: March 17th, 2006.  Size: 45kb.
Tecumseh - Lakeshore Boundary

County of Essex

Looking east from the Manning Road overpass.  The existing ramps to and from Manning Road were substantially reconstructed and realigned as part of the 6-laning project.  The pictured directional ramp seen joining the 401 on the right of this picture was also added.  Manning Road is located roughly at kilometre marker 21.
Picture taken: March 17th, 2006.  Size: 40kb.
Town of Lakeshore

County of Essex

Looking west towards Manning Road from the 9th Concession Road overpass.  The 9th Concession Road overpass is located roughly at kilometre marker 23.

Picture taken: March 17th, 2006.  Size: 50kb.

Town of Lakeshore

County of Essex

Looking east from the 9th Concession Road overpass.  Notice the Truck inspection station on the right of this photo.  This station is set to be reconstructed during the next few years as part of a future highway 401 widening contract.

Picture taken: March 17th, 2006.  Size: 45kb.
Town of Lakeshore

County of Essex

Looking west from the 8th Concession Road overpass.  Obvious from the roughed in acceleration lane from the Inspection station, the newly reconstructed facility will be considerably larger then the current inspection station.

Picture taken: March 17th, 2006.  Size: 45kb
Town of Lakeshore

County of Essex

Looking east from the 8th Concession Road overpass.  This overpass is located roughly at kilometre marker 24.

Picture taken: March 17th, 2006.  Size: 45kb.

Town of Lakeshore

County of Essex

Looking west from the 7th Concession Road overpass along Highway 401.  As evident in the photo, the eastern limits of the 6-laning currently end between the 7th and 8th Concession.  In 2006 Highway 401 will be 6-laned from this point easterly to east of Puce Road.
Picture taken: March 17th, 2006.  Size: 50kb.
Town of Lakeshore

County of Essex

Highway 401 looking east from Puce Road, near Windsor.   Note the exceedingly narrow median width between the two carriageways.  This situation is very dangerous, and thankfully, the MTO is currently upgrading this section of Highway.  This project includes adding a Tall-Wall median barrier separating the opposing directions of traffic. 

Picture taken: April 23rd, 2004.  Size: 40kb.

Town of Lakeshore

County of Essex

View looking easterly along Highway 401 from the French Line Road underpass.  Note the cost-sharing signage left over from the recently completed construction.

Photograph taken: July 6th, 2008

Low-res     High-res

Town of Lakeshore

County of Essex

Highway 401 looking west from the Rochester Townline Road overpass.  This overpass is located roughly at kilometre marker 44.  Once around this gentle curve, Highway 401 heads due west, and is virtually dead-straight for the next 30 kilometres.

Picture taken: December 5th, 2004.  Size: 45kb

Low-res     High-res

Town of Lakeshore

County of Essex

Highway 401 looking east from the Rochester Townline Road overpass.

 

Picture taken: December 5th, 2004.  Size: 50kb

Low-res     High-res

Town of Lakeshore

County of Essex

Overhead guide signage for Highway 77 from the eastbound lanes of Highway 401.

Photograph taken: July 6th, 2008

Low Res



High Res

Town of Lakeshore

County of Essex

During the 2005 reconstruction, the Highway 77/401 interchange was extensively reconstructed.  This new modern interchange replaced a very poor parclo b2 design.

Photograph taken: July 6th, 2008
Low Res



High Res
Town of Lakeshore

County of Essex

Looking west towards Windsor from the Highway 77 overpass.  Just beyond Highway 77, the six lane section of highway narrows to four lanes.  Highway 401 was widened from 4- to 6- lanes between Highway 77 and Highway 2 during 2004 and 2005.

Picture taken: March 17th, 2006.  Size: 45kb.

Highway 77 runs south of Highway 401 to Highway 3 at Leamington.  Click here for Highway 77 images.
Click here for Chatham to London Pictures

Highway 401 Images Index          Page 2 Images ->
Back to Highway 401

<- Highway 400 Images          Images Index          Highway 402 Images ->

www.OntHighways.com - Home


Copyright (c) 2004-2007, Scott Steeves (Webmaster)  webmaster@onthighways.com